[Freeciv-Dev] (PR#17941) Engineers ordered to connect road don't execute
[Top] [All Lists]
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index] [Thread Index]
Subject: |
[Freeciv-Dev] (PR#17941) Engineers ordered to connect road don't execute optimal movement |
From: |
"Peter van der Meer" <peter.vd.meer@xxxxxxxxx> |
Date: |
Wed, 14 Jun 2006 15:48:49 -0700 |
Reply-to: |
bugs@xxxxxxxxxxx |
<URL: http://bugs.freeciv.org/Ticket/Display.html?id=17941 >
On a map-fragment like:
1 2 3
4 5 6
7 8 9
Where
1 = ocean
2 = swamp
3 = plain + river + road (+ Engineer)
4 = grassland
5 = forrest + river (Silk)
6 = forrest + river
7 = Hill
8 = Hill
9 = Hill
If the engineer on tile 3 gets the order to connect 3 to 7 (Connect ->
Road), then it deceides to go to 5 directly to build road instead of
moving to 5 over 6. This makes building the road slowed down by 1
turn.
I'm running Freeciv version 2.0.8 (from a Debian Linux package)
Peter
- [Freeciv-Dev] (PR#17941) Engineers ordered to connect road don't execute optimal movement,
Peter van der Meer <=
|
|